WatchGov

119th Congress

H.R. 626

Northwest Energy Security Act

  1. Introduced
  2. In committee
  3. Passed House
  4. Passed Senate
  5. To President
  6. Became law
Sponsor
Dan Newhouse(R-WA)
Introduced
Jan 22, 2025
Policy area
Water Resources Development
Committees
House Committee on Natural Resources; House Committee on Transportation and Infrastructure
Official text
Introduced in House · Congress.gov page

Cosponsors (3)

Original cosponsors (3)

Summary

Summary by the Congressional Research Service· describes the “Introduced in House” version

Northwest Energy Security Act This bill requires Federal Columbia River Power System (FCRPS) operations to be consistent with the preferred alternative in a 2020 environmental impact statement (EIS) decision that focuses on the operations, maintenance, and configuration of dams in the system rather than wild fish restoration. The system includes dams in the Columbia and Snake rivers in Oregon, Washington, Montana, and Idaho. Specifically, the Bureau of Reclamation, the Bonneville Power Administration, and the U.S. Army Corps of Engineers must operate the FCRPS consistent with the Columbia River System Operations Environmental Impact Statement Record of Decision dated September 2020. Thus, Reclamation, the Bonneville Power Administration, and the Army Corps must follow the EIS rather than the 2023 Resilient Columbia Basin Initiative—and a supplemental EIS proposed in 2024—that focus on wild fish restoration in the Columbia Basin. The EIS decision may be amended if each agency determines that (1) changes are necessary for public safety or electrical grid reliability, or (2) certain requirements in the decision are no longer necessary. Further, the bill requires statutory authorization for any structural modification, action, study, or engineering plan that (1) restricts FCRPS hydroelectric dam generation; or (2) limits navigation on the Snake River in Washington, Oregon, or Idaho.

Roll-call votes

No recorded votes on this bill.

Actions